Connecta IoT
13-14-15-16
Image
JAN 2026
Image
SpaceX’s Twilight Mission

Connecta IoT Network Batch#4: Next Step in Constellation Growth – January 2026 (NET)

The fourth batch of Connecta IoT Network satellites is the next planned expansion of the constellation, scheduled for launch in January 2026 (NET). Four additional 6U Connecta IoT satellites will be placed into LEO, further strengthening network capacity, coverage, and resilience.

Building on the architecture proven in previous batches, Batch#4 continues the same flight-proven 6U platform philosophy, mature IoT payloads, antennas, and software refined across multiple missions, and the multi-link communications stack, inter satellite links, high speed data, and TM/TC channels. With Batch#4 in orbit, the Connecta IoT Network will be able to serve more devices, more regions, and more demanding applications from space.

 

TRACK RECORDS

Other Track Records

Explore Plan-S’s flight heritage, mission history, and the capabilities built through each successful deployment.
Connecta IoT
9-10-11-12
SpaceX’s Transporter 14 Mission JUNE 2025
Image

Connecta IoT
5-6-7-8
SpaceX’s Transpoter 12 Mission JAN 2025
Image

Connecta IoT
1-2-3-4
SpaceX’s Transpoter 11 Mission AUG 2024
Image

CONNECTA
T3.1 & 3.2
SpaceX’s Transpoter 9 Mission NOV 2023
Image

CONNECTA
T2.1
SpaceX’s Transpoter 7 Mission APR 2023
Image

CONNECTA
T1.2
SpaceX’s Transpoter 6 Mission JAN 2023
Image

CONNECTA
T1.1
SpaceX’s Transpoter 5 Mission MAY 2022
Image